Construction of a greenhouse complex

Project nameConstruction of a greenhouse complex
Industry classificationAgriculture
Basic information about the project
Project essenceConstruction of a greenhouse complex for growing vegetables (cucumber and tomato culture)
Project capacity3600 tons of tomato and 3240 tons of cucumber
Consumer market descriptionlarge regional and federal trade networks; canning industry enterprises; public catering establishments; wholesale and retail trade enterprises
Object construction term2.00
Competitive advantageadvantageous arrangement of greenhouses, which ensures a reduction in transport costs and better safety of products during transportation; stable product quality, due to quality seeds, strict observance of technologies for growing vegetables, reduced use of mineral instant fertilizers; wholesale price of produc
Resource availability for project realizationIt is possible to connect to the engineering infrastructure networks
Planned volume of resource consumption (annual)
Planned volume of electricity consumption (annual), MWh1.00
Planned volume of gas consumption (annual), million cubic meters12.00
Planned volume of water consumption (annual), million cubic meters1.60
Degree of project developmentBusiness-plan is developed , area is formed
Financial estimation of the project
Total cost of the project, mln rubles2730.40
Own resources, million rubles0.00
Means of regional (municipal) budget, million rubles0.00
Previously involved means, million rubles0.00
Investment capacity, mln rubles2730.40
Conditions of investor participationDirect investments
Form of investments returnMonetary
Payback period7.25
Basic indicators of investment project economic efficiency
Net present value (NPV)66.97
Simple payback time7.25
Discounted payback period10.75
Internal rate of return (IRR)11.76
Productivity index (PI)1.03
Income per year 857.90
Social efficiency of investment project
Number of workplaces98
Salary average level (thousand rub per year)44700.00
Budgetary efficiency of investment project
Mid-annual tax payments, million rubles162.80
which includes into consolidated budget of the krai, million rubles92.80
General information about the ground area
Address of the areasmt. Mostovskoy, north-west of the land plot with cadastral number 23: 20: 0122001: 29
Cadastre account of ground areaRegistered
Cadastre number of area/of quarter23:20:0122001:120
Declared area (m2)182843.00
Limit size of the area (m2)182843.00
Land categoryLands of inhabited localities
Kind of allowed useAgricultural activity
Actual useIt is not used
Availability of buildings, structures, constructionsThere are not
Permits, town-planning documentationGeneral plan of Mostovskoy settlement (Decision of Council from 18/05/2012, № 131)
Information about proprietor (right holder)
ProprietorThe municipal property
Right holderOpen Company AK "New Time"
Kind of rightRent
Information about encumbrance and limitation
Kind of encumbrance, limitationThe land plot under consideration is located within the boundaries of zones with special conditions for the use of the territory: - within the boundaries of the water protection zone; -in the boundaries of the III zone of sanitary protection of water
Encumbrance area.00
Electricity supply
Power supply center (name, right-holder)Public corporation "Kubanenergo"
Power supply center (electrotension class)High class of tension – from 110 kV to 220 kV
Power supply center (free power (MWt))6.52
Power supply center (distance(m))2300.00
Nearest connection point (network tension, kV)10.00
Nearest connection point (distance(m))250.00
Gas-supplying
Gas pipeline (name, right-holder)Mostovskoe settlment
Gas pipeline (diameter(mm))315.00
Gas pipeline (pressure(MPa))High pressure pipelines of the II category – from 0,3 to 0,6
Gas pipeline (carrying capacity(cube. m.in a year)).00
Gas pipeline (distance(m))300.00
Nearest connection point (diameter(mm))315.00
Nearest connection point (pressure (MPa))High pressure pipelines of the II category – from 0,3 to 0,6
Nearest connection point (carrying capacity (cubic meter a year)).00
Nearest connection point (distance(m))300.00
Water-supply
Water supply source (name, right-holder)There is a need drilling
Water supply source (power (cubic meters a day))0.00
Water supply source (quality of water)Drinking water
Water supply source (distance(m))0.00
Nearest connection point (power (cubic meters a day))0.00
Nearest connection point (diameter(mm))0.00
Nearest connection point (distance(m))0.00
Sewage system
Type of building (name, right-holder)Requires the construction of local treatment facilities
Type of building (power (cubic meters a day))0.00
Type of building (distance(m))0.00
Nearest point of connection (power (cubic meters a day))0.00
Nearest point of connection (diameter(mm))0.00
Nearest point of connection (distance(m))0.00
Installation of telephones/internet
Central network (distance(m))0.00
Mobile communication (distance(m))0.00
Rated price of the ground area supplying with engineering, mln.rub10.50
Distance to the large settlements and objects of a transport infrastructure
Remoteness fromNameDistance (km)
center of municipal formation SMT.Mostovskoy3.00
nearest settlement h. Veselii0.00
Center of federal subject Krasnodar city223.00
highways (regional, federal value) SMT.Mostovskoy- Hamketinsky village0.30
highways of local value village. Mostovskoy- Art. Hamketinskaya0.30
nearest railway station SMT.Mostovskoy3.00
nearest railway SMT.Mostovskoy3.00
airport Krasnodar airport223.00
seaport seaport Tuapse238.00
Additional information about the ground area
Special conditions-
Cost of rent/buy of the ground area, mln. rub.00
Geographical coordinates of object (dd.dddddd)
Latitude (N)44.23000000
Longitude (E)40.45000000
Notes-
Data on the project initiator (in case of existence information about the legal/physical person)
Name / Full nameOOO AK "New Time"
Postal address352570, Krasnodar Territory, smt. Mostovskoy Str. Collective farm, 37/1
Site-
Phone/fax+7(86192) 53338
E-mail addressak-nv@bk.ru
Data about the applicant (executive authority/local government executive authority)
NameAdministration of municipal formation Mostovsky district
Postal address352570, Krasnodar region, Mostovsky district, Mostovskoy settlement, Gorkogo street, 139
Sitewww.mostovskiy.ru
Phone/fax8 (86192) 5-30-82
E-mail addresseconom_most@mail.ru
Executive (Full name, work position, phone number)Dudkina Yuliya Victorovna - chief specialist of the investment, tourism, administrative reform, (86192) 5-30-82

Links