| Project name | Plant for the extraction and processing of salt |
| Industry classification | Extractive industry and natural resources |
| Basic information about the project |
|---|
| Project essence | Building of a plant for the extraction and processing of salt |
| Project capacity | The production of salt "Extra" 171 thousand tons per year, 19 thousand tons of briquetted and 14,25 thousand tons of salt brine |
| Consumer market description | Food and processing industry, chemical industry, agriculture of the Krasnodar region |
| Object construction term | 2.00 |
| Competitive advantage | The presence of mineral resources |
| Resource availability for project realization | Area is located within the mining lease |
| Planned volume of resource consumption (annual) |
|---|
| Planned volume of electricity consumption (annual), MWh | |
| Planned volume of gas consumption (annual), million cubic meters | 18.70 |
| Planned volume of water consumption (annual), million cubic meters | 0.82 |
| Degree of project development | Business-plan is developed , area is formed |
| Financial estimation of the project |
|---|
| Total cost of the project, mln rubles | 1643.40 |
| Own resources, million rubles | |
| Means of regional (municipal) budget, million rubles | |
| Previously involved means, million rubles | |
| Investment capacity, mln rubles | 1643.40 |
| Conditions of investor participation | Direct investments |
| Form of investments return | Monetary |
| Payback period | 5.75 |
| Basic indicators of investment project economic efficiency |
|---|
| Net present value (NPV) | 372.24 |
| Simple payback time | 4.50 |
| Discounted payback period | 5.75 |
| Internal rate of return (IRR) | 41.50 |
| Productivity index (PI) | 1.10 |
| Income per year | 1150.40 |
| Social efficiency of investment project |
|---|
| Number of workplaces | 236 |
| Salary average level (thousand rub per year) | 276.00 |
| Budgetary efficiency of investment project |
|---|
| Mid-annual tax payments, million rubles | 291.79 |
| which includes into consolidated budget of the krai, million rubles | 169.43 |
| General information about the ground area |
|---|
| Address of the area | Mostovsky district, Shedokskoe settlement, east of border Shedok village |
| Cadastre account of ground area | Registered |
| Cadastre number of area/of quarter | 23:20:1203001:121 è 23:20:1203001:1245 (mining allotment) |
| Declared area (m2) | 718600.00 |
| Limit size of the area (m2) | 718600.00 |
| Land category | Industrial land use |
| Kind of allowed use | Production |
| Actual use | It is not used |
| Availability of buildings, structures, constructions | There are not |
| Permits, town-planning documentation | The master plan Shedokskogo rural settlement, town-planning conclusion number 13-16 / 117 of 5 June of 2013. land use and development rules Shedokskogo rural settlement, approved by Council Decision Shedokskogo rural settlement of 14.07.2014, ¹ 223 ( |
| Information about proprietor (right holder) |
|---|
| Proprietor | Administration Shedokskogo rural settlement |
| Right holder | Administration Shedokskogo rural settlement |
| Kind of right | Another |
| Information about encumbrance and limitation |
|---|
| Kind of encumbrance, limitation | A part of the land is located within the deposits of minerals included in the mineral reserve fund distributed: Gubarevskoe field of sand and gravel and Udachnoe field of sand and gravel. When you place an object is necessary to obtain approval of su |
| Encumbrance area | |
| Electricity supply |
|---|
| Power supply center (name, right-holder) | Public corporation "Kubanenergo" |
| Power supply center (electrotension class) | High class of tension – from 110 kV to 220 kV |
| Power supply center (free power (MWt)) | |
| Power supply center (distance(m)) | 8000.00 |
| Nearest connection point (network tension, kV) | 0.40 |
| Nearest connection point (distance(m)) | 2500.00 |
| Gas-supplying |
|---|
| Gas pipeline (name, right-holder) | Public corporation "Gazprom" |
| Gas pipeline (diameter(mm)) | 200.00 |
| Gas pipeline (pressure(MPa)) | High pressure pipelines of the II category – from 0,3 to 0,6 |
| Gas pipeline (carrying capacity(cube. m.in a year)) | |
| Gas pipeline (distance(m)) | 7000.00 |
| Nearest connection point (diameter(mm)) | 200.00 |
| Nearest connection point (pressure (MPa)) | High pressure pipelines of the II category – from 0,3 to 0,6 |
| Nearest connection point (carrying capacity (cubic meter a year)) | |
| Nearest connection point (distance(m)) | 7000.00 |
| Water-supply |
|---|
| Water supply source (name, right-holder) | It is necessary to drill wells |
| Water supply source (power (cubic meters a day)) | |
| Water supply source (quality of water) | Service and drinking water |
| Water supply source (distance(m)) | |
| Nearest connection point (power (cubic meters a day)) | |
| Nearest connection point (diameter(mm)) | |
| Nearest connection point (distance(m)) | |
| Sewage system |
|---|
| Type of building (name, right-holder) | Requires the construction of local treatment facilities |
| Type of building (power (cubic meters a day)) | |
| Type of building (distance(m)) | |
| Nearest point of connection (power (cubic meters a day)) | |
| Nearest point of connection (diameter(mm)) | |
| Nearest point of connection (distance(m)) | |
| Installation of telephones/internet |
|---|
| Central network (distance(m)) | 1600.00 |
| Mobile communication (distance(m)) | |
| Rated price of the ground area supplying with engineering, mln.rub | 238.00 |
| Distance to the large settlements and objects of a transport infrastructure |
|---|
| Remoteness from | Name | Distance (km) |
|---|
| center of municipal formation | SMT.Mostovskoy | 31.00 |
| nearest settlement | Shedok village | 5.00 |
| Center of federal subject | Krasnodar city | 246.00 |
| highways (regional, federal value) | Labinsk city - Mostovskoj town – Border of Karachaevo Circassian republic | 1.50 |
| highways of local value | Shedok village | 5.00 |
| nearest railway station | Shedok village | 5.00 |
| nearest railway | Shedok village | 5.00 |
| airport | Krasnodar airport | 246.00 |
| seaport | seaport Tuapse | 259.00 |
| Additional information about the ground area |
|---|
| Special conditions | - |
| Cost of rent/buy of the ground area, mln. rub | |
| Geographical coordinates of object (dd.dddddd) |
|---|
| Latitude (N) | 44.21000000 |
| Longitude (E) | 40.87000000 |
| Notes | This area is in accordance with the documents of territorial planning is seen as areas of mining leases and promising under development (for industrial areas) |
| Data on the project initiator (in case of existence information about the legal/physical person) |
|---|
| Name / Full name | Administration of municipal formation Mostovsky district |
| Postal address | 352570, Krasnodar region, Mostovsky district, Mostovskoy settlement, Gorkogo street, 139 |
| Site | www.mostovskiy.ru |
| Phone/fax | 8 (86192) 5-30-82 |
| E-mail address | econom_most@mail.ru |
| Data about the applicant (executive authority/local government executive authority) |
|---|
| Name | Administration of municipal formation Mostovsky district |
| Postal address | 352570, Krasnodar region, Mostovsky district, Mostovskoy settlement, Gorkogo street, 139 |
| Site | www.mostovskiy.ru |
| Phone/fax | 8 (86192) 5-30-82 |
| E-mail address | econom_most@mail.ru |
| Executive (Full name, work position, phone number) | Dudkina Yuliya Victorovna - chief specialist of the investment, tourism, administrative reform, (86192) 5-30-82 |